859,000 lbs of sheet metal used on this project. 49,000 ft of water piping for sinks, toilets, and other plumbing fixtures.Over 430 VAV terminal units serve individual spaces to keep passengers comfortable. The new terminal is heated and cooled by 31 main air handling units (AHUs) that distribute air throughout. Ventilation air is brought in through dedicated energy recovery units that add to the project’s LEED Gold certification. Starting with 39 gates, with the ability to expand to 50, the project occupies over 1 million square feet. Engineering Construction helmed the design-build mechanical duties on the largest single infrastructure project in Kansas City’s history: Kansas City International Airport’s new terminal and parking structure.